Aleck Streambank Restoration
The project involves the stabilization of Truckee River banks on the Pyramid Lake Paiute Reservation in Nixon, Nevada. These improvements will prevent shearing/head-cutting of the banks during future flood events. Approximately 1500 lineal feet of river bank will be stabilized.
TMWA Benefit:
This project improves overall Truckee River water quality which translates into resource benefits to TMWA.